Entouch Energy Management
ENTOUCH offers software, IoT powered devices, and expert advisory services as a comprehensive solution for optimized smart building management. The energy management model is seamlessly integrated over a secured wireless network with your existing smart building technology infrastructure (BACNET) to create immediate value and a return on investment for your entire enterprise. The managed cloud-based platform lowers capital expense, reduces maintenance costs, and provides limitless scalability.
ENTOUCH’s 24/7 command center monitors everything – we proactively analyze your facility data, identify patterns, trends, and inconsistencies; and work to resolve HVAC, lighting, equipment, and 3rd party sensor issues. We also provide custom reporting so you can track activity anytime, anywhere from your smartphone, tablet, or computer in real-time.
ENTOUCH has more than 10,000 sites installed in a wide range of industries including:
- Retail
- Restaurant
- Financial Services
- Healthcare
- Municipal
BACNET, ASHRAE (American Society of Heating Refrigeration and Air Conditioning Engineers), and ISO compliant.
Products
ENTOUCH.one Controller
ENTOUCH.one Master Controller
ENTOUCH.one Lighting Control
ENTOUCH.one GM8 Energy Monitor
Safe Environment
Other Resources
ENTOUCH Standard Sequence of Operations.
RTU Sequence of Operations
CALL FOR COOL WHEN OCCUPIED AND UNOCCUPIED
THERMOSTAT ENGAGES Y1 (STAGE1 COMPRESSOR) AND G (FAN) WHEN THE TEMPERATURE IS 1 DEGREE ABOVE THE SET POINT. THE FIRST STAGE OF COOLING WILL REMAIN ENGAGED UNTIL THE TEMPERATURE IS 0.5 DEG BELOW THE COOL SET POINT. THE SECOND STAGE OF COOLING (Y2) WILL ENGAGE WHEN THE SPACE TEMPERATURE IS 2 DEG ABOVE THE COOLING SET POINT AND WILL DIS-ENGAGE ONCE THE SPACE TEMPERATURE IS WITHIN 1 DEG OF THE COOLING SET POINT.
CALL FOR HEAT WHEN OCCUPIED AND UNOCCUPIED
THERMOSTAT ENGAGES W1 (STAGE1 HEATING) AND G (FAN) WHEN THE TEMPERATURE IS 1 DEGREE BELOW THE SET POINT. THE FIRST STAGE OF HEATING WILL REMAIN ENGAGED UNTIL THE TEMPERATURE IS 0.5 DEG ABOVE THE HEAT SET POINT. THE SECOND STAGE OF HEATING WILL ENGAGE WHEN THE SPACE TEMPERATURE IS 2 DEG BELOW THE HEATING SET POINT AND WILL DIS-ENGAGE ONCE THE SPACE TEMPERATURE IS WITHIN 1 DEG OF THE HEATING SET POINT.
NO CALLS FOR HEAT OR COOL
WHEN NO CALL FROM THE THERMOSTAT THE HVAC SYSTEM WILL REMAIN IDLE. THE FAN FOR THE HVAC UNIT WILL REMAIN OFF.