Entouch Energy Management

 

ENTOUCH offers software, IoT powered devices, and expert advisory services as a comprehensive solution for optimized smart building management. The energy management model is seamlessly integrated over a secured wireless network with your existing smart building technology infrastructure (BACNET) to create immediate value and a return on investment for your entire enterprise. The managed cloud-based platform lowers capital expense, reduces maintenance costs, and provides limitless scalability.

ENTOUCH’s 24/7 command center monitors everything – we proactively analyze your facility data, identify patterns, trends, and inconsistencies; and work to resolve HVAC, lighting, equipment, and 3rd party sensor issues. We also provide custom reporting so you can track activity anytime, anywhere from your smartphone, tablet, or computer in real-time.

View ENTOUCH general presentation

ENTOUCH has more than 10,000 sites installed in a wide range of industries including:

  1. Retail
  2. Restaurant
  3. Financial Services
  4. Healthcare
  5. Municipal

BACNET, ASHRAE (American Society of Heating Refrigeration and Air Conditioning Engineers), and ISO compliant.

Case Studies

 

 

JCPennys

 

Chuck E Cheese

 

BGIS

 

Products

 

 

ENTOUCH.one Controller

User Manual

ENTOUCH.one Master Controller

User Manual

ENTOUCH.one Lighting Control

User Manual

ENTOUCH.one GM8 Energy Monitor

User Manual

Safe Environment

ESG,SRI, and Building Energy PDF

ESG,SRI, and Building Energy

Deterring Spread of Viruses

Deterring Spread of Viruses

Other Resources

 

 

ENTOUCH Standard Sequence of Operations.

RTU Sequence of Operations

CALL FOR COOL WHEN OCCUPIED AND UNOCCUPIED

THERMOSTAT ENGAGES Y1 (STAGE1 COMPRESSOR) AND G (FAN) WHEN THE TEMPERATURE IS 1 DEGREE ABOVE THE SET POINT.  THE FIRST STAGE OF COOLING WILL REMAIN ENGAGED UNTIL THE TEMPERATURE IS 0.5 DEG BELOW THE COOL SET POINT.  THE SECOND STAGE OF COOLING (Y2) WILL ENGAGE WHEN THE SPACE TEMPERATURE IS 2 DEG ABOVE THE COOLING SET POINT AND WILL DIS-ENGAGE ONCE THE SPACE TEMPERATURE IS WITHIN 1 DEG OF THE COOLING SET POINT.

CALL FOR HEAT WHEN OCCUPIED AND UNOCCUPIED

THERMOSTAT ENGAGES W1 (STAGE1 HEATING) AND G (FAN) WHEN THE TEMPERATURE IS 1 DEGREE BELOW THE SET POINT.  THE FIRST STAGE OF HEATING WILL REMAIN ENGAGED UNTIL THE TEMPERATURE IS 0.5 DEG ABOVE THE HEAT SET POINT.  THE SECOND STAGE OF HEATING WILL ENGAGE WHEN THE SPACE TEMPERATURE IS 2 DEG BELOW THE HEATING SET POINT AND WILL DIS-ENGAGE ONCE THE SPACE TEMPERATURE IS WITHIN 1 DEG OF THE HEATING SET POINT.

NO CALLS FOR HEAT OR COOL

WHEN NO CALL FROM THE THERMOSTAT THE HVAC SYSTEM WILL REMAIN IDLE.  THE FAN FOR THE HVAC UNIT WILL REMAIN OFF. 

ENTOUCH Portal Training Presentation

Considering going solar? Let us help you find the best solution.